Gazebo progress in pictures
Click on thumbnails below to enlarge.
Thyja logs - Eastern White Cedar (Harvested
locally.)
The Walls
1 post
4 Posts
Top row of logs and mitered ends.
The Roof
Installing the joists. (Instead of putting up scaffolding to support the centre hub, I used a post. I'll cut the top and bottom off when done.)
Strapping and Cedar Shakes
The floor
Pea Stone and Flag
A walk through.
The End (for now)
To avoid spam, please cut and paste Phil@LandAndPlant.ca into your email program.